Tuesday, 3 April 2012

Pictures of sites.


Site A.


Site B.
Results:
Water PH:                                                                     Soil Ph:        
A1: 6.1                                                                          A1: 7.1
B1: 6.8                                                                          B1: 7.6
A2:  7.7                                                                         A2: 6.3
B2:   7.3                                                                        B2: 6.0
Water phosphate:                                                          Soil Phosphate:
A1:  25                                                                          A1: 25
B1:   10                                                                         B1: 25
A2:   50                                                                        A2: 25
B2:   50                                                                         B2: 50
Water salinity silver nitrate:                                            Soil salinity silver nitrate:
A1: Medium                                                                  A1: high
B1: Medium                                                                  B1: high
A2: High                                                                       A2: high
B2: High                                                                       B2: high
water salinity conductivity:                                            Soil salinity conductivity:
A1: 1,000                                                                     A1: 1,000
B1:  875                                                                       B1: 865
A2:  1,000                                                                    A2: 1,000
B2:   1,000                                                                   B2: 1,000
Water Turbidity NTUs:                                                 Soil weight (g):
A1: 26.4                                                                       A1:5.11
B1:  19.5                                                                       B1: 6.1
A2:   0                                                                          A2: 1.7
B2:    0                                                                          B2:7.8

Tuesday, 27 March 2012

25th march 2012
Taken second set of samples at sites A and B. Soil samples were much more dry than the first time as a result of the little amount of rain in the days since. Samples were taken at a relatively high and out going tide; the opposite of the state of the tide last time I took my sample.
I'm expecting these samples to be less polluted than the samples taken last week because of the dry days since meaning less run off from the fertilised parks and urban areas.

Sunday, 18 March 2012

Map


18/03/12
Taken samples today from the cooks river on a low, incoming tide. Sample A was taken from the South side of the river while Sample B was taken from the North side.
Site Distance:1-2km
Photos:forthcoming
Map:forthcoming
Photos will be taken upon the retrieval of the next set of samples, these samples will be taken on a high outgoing tide.